
Signature
HTH
Bob Phillips
(remove xxx from email address if mailing direct)
it did not work. B9 has the date it arrived at whse. I9 is the cell that I
need to have the number of days since merchandise arrived. Ex arrived on
05/10/06. the I9 should read "9". With the formula =TODAY()-B9 it reads
"01/22/00"
> =TODAY()-A1
>
[quoted text clipped - 3 lines]
> > date and the date the spread sheet is opened.
> > I need to know the number of days a merchandise has been stored.
Kevin Vaughn - 19 May 2006 20:01 GMT
Format that cell as general

Signature
Kevin Vaughn
> it did not work. B9 has the date it arrived at whse. I9 is the cell that I
> need to have the number of days since merchandise arrived. Ex arrived on
[quoted text clipped - 8 lines]
> > > date and the date the spread sheet is opened.
> > > I need to know the number of days a merchandise has been stored.
South texas man - 19 May 2006 20:37 GMT
Sorry,
I don't know what I did wrong, it worked. THANKS!!!!
> it did not work. B9 has the date it arrived at whse. I9 is the cell that I
> need to have the number of days since merchandise arrived. Ex arrived on
[quoted text clipped - 8 lines]
> > > date and the date the spread sheet is opened.
> > > I need to know the number of days a merchandise has been stored.