| Thread | Last Post | Replies |
|
| Graphing "" values | 18 Nov 2005 21:53 GMT | 3 |
I am attmepting to graph data that includes both numerical values and non-numerical (i.e., "") values. The data is as follows: A B C D E
|
| Graphing a logarithmic regression line | 18 Nov 2005 19:26 GMT | 3 |
Is it possible to graph a logarithmic regression line on Excel? Here is the line I need help graphing:::::1.649+1.968lnx The Ln stand for natural log. Thanks!!
|
| Scatter and line charts | 18 Nov 2005 19:14 GMT | 1 |
I created the scratter chart and I would like to have another line, showing the average, will go horizontal across the scratter chart. Ex: 4,5,6,7,10 are data to create a scratter chart. The averager of 4,5,6,7,10 is 6.4
|
| Line Graph and Shading | 18 Nov 2005 18:30 GMT | 2 |
Here is what I would like to do; I’d like to shade the area following the crossing of Line1 and Line2 in a different color and highlight and label the point at which the lines cross. Line1 is “Current Cost” and Line2 is “Projected Cost”, the area following the crossing I’d like ...
|
| Missing x-axis labels on chart in XL97 | 18 Nov 2005 17:41 GMT | 2 |
Bit of a strange one this. I have a workbook containing lots of charts built using dynamic ranges. I have built them in XL2000, where all is well, but on opening in XL97 via a Citrix W2000 Desktop, the x-labels disappear. I have tried all the following to get them to reappear:
|
| two colours in the plot are of a chart | 18 Nov 2005 16:27 GMT | 3 |
There is adiagram with values of a stock And there are values before 2003 and after 2003 There is possibility in the plot area the colour to be double? For example in the area of values befor 2003 to be yellow and after 2003 to
|
| Line Chart - show percent and value? | 18 Nov 2005 16:25 GMT | 5 |
I thought this would be easy, but I am really stumped! I need to show the percentage in addition to the value in the data labels for a line chart. Example,
|
| Macro fails to produce Category Name and Percentage values - Pie C | 18 Nov 2005 12:09 GMT | 3 |
Microsoft Office Excel 2003 (11.6355.6360) SP1 When you record a macro in Excel to produce a Pie Chart with 'Chart Title', 'Category Name' and 'Percentage', and when the macro is run it produces the Chart with 'Chart Title' but does NOT add the 'Category Name' and
|
| double pie chart | 18 Nov 2005 10:39 GMT | 3 |
I sent a questionnaire out to 700 employees, 200 of which completed and returned them. I am now trying to produce the results in a 'pie of pie' chart - the one with two pies. I want the first chart to show that 700 questionnaires were sent out and 200
|
| Categorised / Stacked column chart | 18 Nov 2005 04:44 GMT | 1 |
Can someone tell me how to create the following style of chart? [image: http://img427.imageshack.us/img427/5287/examplechart6cr.png] Thanks. :)
|
| How do I get focus back on an Excel file? | 18 Nov 2005 01:22 GMT | 1 |
When automating Excel, if there is a picture (graphic) on the worksheet, when the file is opened, the picture has the focus and mouse-clicks anywhere on the Excel window are lost. Is there a way to get the focus back so that other cells can be editted?
|
| link chart title? | 17 Nov 2005 23:44 GMT | 2 |
I've learned about dynamic charts in this forum which has been very helpful in autmating some charts that I use. I would also like the chart title be linked in some way to a cell. Is that possible?
|
| How to obtain the root of f(x) in this interval? | 17 Nov 2005 19:40 GMT | 2 |
I am trying to draw a graph here, plotted graph x, with function f(x) at y-axis, does anyone know how to get the approximation to the root of f(x) in this interval. What is the value of x if i wish to obtain f(x)=0?
|
| Double stacked columns - can it be done? | 17 Nov 2005 19:22 GMT | 4 |
I need 2 stacked columns side by side for each month. Here is the data for October: Forecast Credits 200 Forecast Cash 50
|
| xy scatter format | 17 Nov 2005 17:54 GMT | 2 |
Hope someone can help. I have a chart i want to make look a little more professional. The chart plots three points within two boxes. the points should be inside the box
|