| Thread | Last Post | Replies |
|
| Minimum and maximum value of Axis set by user by reference to form | 22 Jun 2007 18:30 GMT | 1 |
Excel seems to have 2 alternatives for defining the min/ max value of an axis: either automatically or preset by the user. But is there any way that the minimum and maximum value that the axis is defined by the user based on the values of the spreadsheet (i.e., halfway
|
| Chart dependent on column | 22 Jun 2007 16:58 GMT | 1 |
I need to make a series of charts that depend on a column in my datasheet. What I mean is this - I have data laid out per below, that is logged by operators throughout the day: Date Time Color Reading
|
| chart "squaring" | 22 Jun 2007 13:46 GMT | 3 |
I'm trying to "square" a chart... I mean: given 2 points (P1 and P2) with coordinates P1(x1,y1) and P2(x2,y2), I want set the vertical (y) distance between P2 and
|
| Size of plot area expands when Chart Title is deleted - why? | 22 Jun 2007 13:05 GMT | 2 |
I have a worksheet with about 8 charts on it. On all but 1 chart, when I delete the Chart Title, the plot area expands. Can anyone tell me why this happens? I'm no chart expert and I can't seem to find any obvious setting that would control that behavior.
|
| Source Data Mess | 22 Jun 2007 05:49 GMT | 1 |
Using Excel 2003 I created one pie chart and then did a copy & paste to paste that same chart into another worksheet. Then I right-clicked and chose “Source Data” and then highlighted the data for the new chart with the new raw data. There’s
|
| HELP! | 22 Jun 2007 02:59 GMT | 1 |
I am just learning to use Excel charts and need some assistance -- I want to show goals versus acutal on a horizontal bar chart and i cannot figure out how to format the data and label the axis. Can you help me??
|
| Trendline error | 22 Jun 2007 00:43 GMT | 2 |
Has anyone else found an error in the trendline tool in excel 07? I found that when transforming the x axis to logarithmic, the trendline stays linear, when it should curve with the axis. I think this started happening when I moved between 07 and 03 using the compatibility ...
|
| Pie in Pie Chart | 21 Jun 2007 23:42 GMT | 1 |
Hi Folks - I have the following data: Salaries 29% Programs 71% dept1 9%
|
| Peltiertech dynamic control chart | 21 Jun 2007 22:34 GMT | 2 |
http://peltiertech.com/Excel/Charts/statscharts.html How can this dynamic control chart is made. Need step by step instruction Thanks Daniel
|
| Creating notches in box whisker plots in Microsoft Excel | 21 Jun 2007 22:27 GMT | 20 |
Does anyone know how to create the notches in the vertical box whisker charts? An example can be found in figure 10 of the following article: http://www.qualitydigest.com/oct97/html/excel.html
|
| bar graph column label alignment | 21 Jun 2007 22:20 GMT | 3 |
I'm using a stacked bar graph and would like to align the x axis label with the edge of each column instead of having the label centered on each column.
|
| Stacked charts | 21 Jun 2007 18:09 GMT | 2 |
I want to to create a chart where the colour changes when ever a value is reached. Ex. I have a mashine that produces 1000 it's goal is 2000. The chart should then show a column that is red because it is under the goal. I also have a maschine that produces 3000 and the goal is ...
|
| excel chart - absolute referencing????! | 21 Jun 2007 17:59 GMT | 1 |
I have a form I created in VB and it facilitates data entry into a spreadsheet. Once I fill out the textboxes and click ok, it inserts a new row into the spreadhseet with the new info below the second row. So all the other rows containing previously entered info move down. I need ...
|
| dialog box for axis minimums, maximums, and major units | 21 Jun 2007 14:40 GMT | 2 |
I am using the macro below to set the axis minimums, maximums, and major units for a series of charts. I would like to tie this macro to RefEdit controls, so that when I enter the keyboard shortcut Ctrl+Shift+A in the active chart, a dialog box opens with three RefEdit controls ...
|
| Line and Point in the same chart? | 21 Jun 2007 06:04 GMT | 2 |
I have data as follows: M L G Y Jan 5 7 8 2 Feb 4 7 1 4
|