| Thread | Last Post | Replies |
|
| help with bar graph | 30 Apr 2008 22:54 GMT | 1 |
Someone has created a bar graph that charts 4 figures per year. Therefore, there are 4 bars for each year as displayed across the X-axis. Is there a way to make 3 of the bars stack on top of each other while leaving the 4th bar alone (this behavior would be repeated for each ...
|
| Sizing charts uniformly {need some tricks here} | 30 Apr 2008 13:25 GMT | 7 |
With a number of worksheets with similar charts, I need to clip out the charts basically all the same size for PowerPoint. Would like to size them to the nearest 5-pix both height and width but none of the methods are working.
|
| How do I create a two axis chart - two datasets | 30 Apr 2008 13:24 GMT | 1 |
I wish to create a two axis line chart displaying height vs. reaction mass. I cannot seem to find a way for excel to display this information. Can someone help me out?
|
| How to create chart | 29 Apr 2008 23:54 GMT | 1 |
New questioner, please excuse.... I'm trying to create a chart. I have 4,000+ rows and only 1 column. I'm trying to create what I term as a % chart. What percentage of the column is
>100, between 50 - 100, between 0 - 50, etc etc etc. Can anyone help direct |
| Line Graphs with X-Axis Representing Hours | 29 Apr 2008 22:29 GMT | 1 |
Here's the data I want to plot with multiple lines, one for A, B and C, which are quantities of things. The start time actually represents the start of an hourly window when these things accumulate. So one would read this as "Between 7:00 and 8:00, 944 things accumulated, 786 ...
|
| Bridge Chart | 29 Apr 2008 22:28 GMT | 1 |
I am trying to create a bridge chart into an Powerpoint presentation
|
| charts | 29 Apr 2008 19:49 GMT | 1 |
let's say i have a column chart that contains about 25 values and i want to divide these values into 3 or 4 groups such that every group have a different colour and pattern and a gap between itself and the next group, can i do this without having to change the colour of every ...
|
| What is a Range Chart | 29 Apr 2008 18:14 GMT | 4 |
I've just been asked by my boss to create a range chart. I have no idea with it is.
 Signature DMM
|
| Textbox on chart doesn't print in Office 2003, but does in 2007 | 29 Apr 2008 15:32 GMT | 1 |
I have some charts that I create through C# code on a "template" worksheet and then copy it over to a new worksheet using the following code. When looking at the chart.Shapes, I can see the three Textbox objects that I want and these are the only shapes available. I can see ...
|
| How do I create a chart with 6 bars for data and 1 total line | 29 Apr 2008 15:16 GMT | 2 |
I have 6 products that I have created a bar chart for showing total units sold for 5 years. I want to add a line (just one) that shows the total units sold for the entire product category over the same time period to the same chart. I tried combination chart but it changes 1/2 ...
|
| pohyblivé maximum u grafu | 29 Apr 2008 13:14 GMT | 1 |
Jak mám zajistit nastavení maxima (nebo minima) u grafu pomocí hodnoty v buňce?
|
| Graph while ignoring text but not changing text to #NA | 29 Apr 2008 01:49 GMT | 1 |
I have read how to trick excel into ignoring text within a series range by using =NA(). Is there a way to ignore the text in a xy scatter chart (i.e. does not plot as 0) but still keeps the text visible. For example on certain days a well is not sampled and so is left with "NM" ...
|
| charting extreme number differences on x-axis | 28 Apr 2008 23:36 GMT | 1 |
I've seen cahrts where the X axis has 2 slashes to represent gaps in the numbers where extreme ranges of data is charted. how do I do that?
|
| labels in line chart | 28 Apr 2008 22:55 GMT | 1 |
I have a table with columns "date", "lot number", "variable. 1", "variable2". I want to plot "variable. 1", "variable2" as a function of date. No problem so far, and label with "lot number". Any suggestions?
|
| Extra Slice in Pie in Pie chart | 28 Apr 2008 19:43 GMT | 4 |
I have created a Pie in Pie chart, but excel has added an extra slice in the first chart. And then Excel has taken the data I need for the extra pie, and used that data and the separate date and put them in the other pie chart. How do I get my main date back into the first pie ...
|