| Thread | Last Post | Replies |
|
| Charting software: what does The Economist use? | 12 Aug 2008 01:09 GMT | 3 |
Any clue of what software the people at The Economist uses to create charts? I’m wondering whether there is some software out there better than MS Excel that would give better control without the onerous workarounds.
|
| Trendling for each month when data is for 5 months | 11 Aug 2008 22:19 GMT | 1 |
I have data from 1/1/08 thru 8/10/08 - how do i set a trending line for each month of data to be shown only for the monthly period
|
| Combination Stacked Bar and Line Graph | 11 Aug 2008 22:18 GMT | 1 |
I am trying to create a combination stacked bar and line graph whereby the data for the stacked bar relates to one axis and the line to a second axis. Is this possible in excel?
|
| chart sizes with window frame | 11 Aug 2008 03:36 GMT | 1 |
Does anyone know if there is a option in Excel 2007 similar to the option "chart sizes with window frame" in Excel XP?
|
| Graphs | 11 Aug 2008 02:26 GMT | 1 |
Can someone explain how to do a graph? Specifically for a finance class. I need to do a breakeven graph and a EBIT-EPS indifference graph.
|
| Number of visible Tick Labels limited to 100 in Excel 2007 | 09 Aug 2008 23:38 GMT | 4 |
I have a line chart with more 120 categories. Even though I set the "Interval between Labels" under "Format Axis" to "1", the chart shows every other labels instead of every label. Then I reduced the number of categories to exactly 100, and the chart then
|
| Piviot Chart - format x axis | 09 Aug 2008 18:38 GMT | 1 |
I know this must be easy but I am having a brain freeze and just can't seem to think of how to do this. I have a piviot chart and the x-axis has dates. It is currently displayed as "7/31/08" and I want it to be "Jul-08". I've gone into the format area
|
| Selecting multiple series in pivot chart | 09 Aug 2008 15:36 GMT | 3 |
In Excel2007, I have a pivot bar chart with over 20 stacked series. I order to change the look of the bars, I have to select them all first. I have not found a way to select more than one series at a time and it makes changing the shape style very cumbersome.
|
| Why patterns are no longer available in Excel 2007? | 09 Aug 2008 09:55 GMT | 8 |
I'm really very sad to see pattern is not available. Anyone who says it is out of date just try creating a black-and-white document with charts of Excel-2007 style, you'll see the pictures are really not as impressive as the traditional patterns.
|
| How to add colum totals to a pivot chart data table | 08 Aug 2008 22:49 GMT | 1 |
I have a chart for pivot table and would like to so totals for the data. The data table on the chart displays the pivot table data but not the totals for each column. How can the totals be displayed on the chart?
|
| Stacked bar, bar and line graph | 08 Aug 2008 22:45 GMT | 1 |
I am trying to create a chart with the following data: Series 1-8 with bars Series 9-10 with stacked bars (two different data) Series 1-10 with a line across all
|
| Can I use non-numeric x axis data in excel charts? | 08 Aug 2008 18:25 GMT | 2 |
I need to show numeric data on the y-axis versus categories, not numbers, on the x-axis in a scatterdiagram (in other words there will be several different y-axis data poits for each x-axis category) . How do I do this in an excel scatter graph?
|
| How to change labels on axis? | 08 Aug 2008 16:27 GMT | 1 |
I have a column bar chart in Excell 2007. The labels on my bars contain the text of each cell for that bar. These are currently stock symbols. I'd like to put the symbol in parenthesis and append the stock name. How can that be done?
|
| How to produce a chart based on number of cells not values in the cells | 08 Aug 2008 14:52 GMT | 2 |
I'm using Excel 2007. I have a requirement to base a chart on the number cells rather than the values in the cell. For example, here are some values I might enter against Monday to Friday:
|
| Gantt chart in Excel 2003 | 08 Aug 2008 14:46 GMT | 3 |
Is there an easy way to create a simple Gantt chart in Excel 2003? It would be a 6 month timeline of project deadlines and milestones. I have no experience with Gantt charting, nor do I have any experience with MS Project. So I am completely at a loss. Any ideas?
|