MS Office Forum / Excel / New Users / April 2007

Tip: Looking for answers? Try searching our database.

ThreadLast Post  Replies
Copy/Paste Problem21 Apr 2007 16:01 GMT5
Suddenly my copy/paste is broken -- presumably I've inadvertently mucked up
some bit of profile somewhere but I haven't stumbled upon it.  I'm using
Excel 2003 under XP with all current patches.
I've always been able to open up two workbooks and copy something from one
Send an email to entire list one at a time?21 Apr 2007 14:13 GMT1
I have an excel list with 900+ full entries (chamber of commerce).  About 800
have email addresses.  I would like to send a letter to each, preferably one
at a time so it won't be filtered as spam.
I am using 2003 version, and I'm a total beginner with excel.  Anybody up
highest and lowest values21 Apr 2007 06:47 GMT7
How do I remove the highest and lowest values from a series of fields?
calculate difference means when groups have different (n)21 Apr 2007 04:10 GMT2
I need to run a test for a diference between means when the groups have
different numbers (n).  Please post to newsgroups or remove the pound sign
in return address.
INPUT RANGE21 Apr 2007 02:01 GMT1
In the following code I want to have the program ask me what range and then
substitute that range for "Dasher_accounts".
How?
For Each cell In ThisWorkbook.Sheets("lists") _
Unable to display window along top of screen for entering information.21 Apr 2007 01:55 GMT3
I'm using Office 2003 with Windows XP.  Every time I open Excel the window
comes up without the narrow window along the top of the screen for editing
and entry of text information into a cell.  Can't get it back no matter how
hard I try.  Even tried reinstalling Office.
Jumping Cells and Rows20 Apr 2007 22:30 GMT1
I am still struggling with the problem that I have with my Excel and would
appreciate your help.
The problem is very simple: My up/down/left/right arrow moves two row or
columns, instead of one.
naming cells20 Apr 2007 22:21 GMT2
I have named my cells so there is no formula only names, yet it only
shows the cells formula not the name in the formula bar. what am i
doing wrong
Why oh Y20 Apr 2007 21:56 GMT18
I've just come across a very weird oddity with Excel 2003.
I have a spread sheet which has formula which reads information from another
(external) worksheet.  The information is a reference in the format
"AAAnumbersY".  If the source file is open when the problem file is open it
How can I count the number of months between 2 dates?20 Apr 2007 21:52 GMT3
For instance, I am trying to compute how many months are left in leased
equipment contracts.  I have a spreadsheet with the ending dates for all the
individual contracts.  
What I would like to be able to do is to calculate the number of months
sub totals20 Apr 2007 21:04 GMT8
I have a worksheet with two colums of data:  Col. A has the student ID.  Col
B had codes and the integer "1."  There may be 10 lines of codes for each
student, or six lines.   I need to sub total the number of "1's" for each
student id and put that number into Col C.  Can I do ...
Grading - Marks20 Apr 2007 20:43 GMT9
I have more than one worksheet containing marks that result from certain
calculations.
I need to change them from numbers to A, B, C according to the following:
mark is between 95 100  gives A+
copy20 Apr 2007 20:11 GMT2
I am working with 2 workbooks.
I want to copy contents in ColJ from WKBK2  to ColF in WKBK5.
My content contains a lot of text.
Sub CopyAndPaste()
Opening an ACCESS db from the VBE in EXCEL20 Apr 2007 19:35 GMT2
What is the VBA code for opening an existing ACCESS database from the VBE ?
I can't find any specific reference to this when I google it.
Thanks in advance for any assistance.
Shift Planner20 Apr 2007 18:24 GMT1
I need to make a Shift Planner in Excel with which I will be able to
track and plan the work timings of my team members. Do you know if
there is any excel tool/template already available for this?
Thanks,
 
Sign In
Join
My Latest Posts
My Monitored Threads
My Blog
My Photo Gallery
My Profile
My Homepage

Start New Thread



©2008 Advenet LLC   Privacy Policy - Terms of Use
This website includes both content owned or controlled by Advenet as well as content owned or controlled by third parties.